
Talk to your project
Published September 7, 20264 min read
Talk to your project. Linky looks at the photos and the checklists already on the job, then answers from that visit.
Who closed electrical. What is still open. Whether the photos landed — and when.
Talk to your project
Talk to the project
From this project
What is the team working on?
Looking at today's submissions and who uploaded them…
Ana closed electrical this morning — 8 of 8. She uploaded the panel photos on item 4 at 9:14. Carlos is still on formwork — 4 of 9. His last photo is the shoring, at 11:02. The slab pour still has no photo.
It reads who is assigned, which checklist items are done, and which photos are on the item. If it is not on the job, Linky cannot invent it.
The same objects as One project, any procedure. If the list is still a PDF, From paper or PDF to a team template.
Create your account and talk to the next project. See pricing when the whole team should share the same Linky.
Ready for the next job?
Create your account and keep the trail on the project.