Minipa Link
Back to solutions
Electrical installations

Every inspection documented before you leave

Photos, Bluetooth readings and a client report on the same project — panels, circuits and grounding.

01

Visit stages

Pick a stage. The phone follows the visit — from the first photos to the inspection report.

9:41●●● 5G
LV electrical — commercial plant
Norte EngenhariaStage 1/602/08 – 20/08São Paulo, SP
Active
LV
JSMALF
Checklists2
Tasks1/4
Documents
Organize1
Media (4)
22 Jun 2026
JSPanels
MACircuits
LFLoads
JSGrounding

Stage 1/6 · Project opened · first photos

9:41●●● 5G
LV electrical — commercial plant
Norte EngenhariaStage 1/602/08 – 20/08São Paulo, SP
Active
LV
JSMALF
Checklists2
Tasks1/4
Documents
Organize1
Media (4)
22 Jun 2026
JSPanels
MACircuits
LFLoads
JSGrounding

Stage 1/6 · Project opened · first photos

02

On the phone and on the web

The project on the phone, the inspection report, and one team panel — activity or the report editor.

9:41●●● 5G
LV electrical — commercial plant
Norte Engenharia02/08 – 10/08São Paulo, SP
Active
LV
JSMALF
Checklists6
Tasks8/12
Documents2
Organize4
Media (6)
22 Jun 2026
JS
MA
LF
JS
MA
LF
Project on the phone
9:41●●● 5G
ChecklistPanel round
4/667%
Stage statusSingle choicePanels
Not startedIn progressDone
Progress photosSingle choicePanels
PassFailN/A
Photo22 Jun 2026
InsulationSingle choiceMI-2705
>1 GΩ100 MΩ–1 GΩ<100 MΩ
Photo22 Jun 2026
>100 MΩ
Measurement22 Jun 2026
ThermographySingle choiceMTV-10M
No hotspotsLocal hotspotCritical
Photo22 Jun 2026
Max 41,8 °C
Measurement22 Jun 2026
Open NCsSingle choicePanel pending
NoneOpen NCs
NotesChecklistStage notes
Checklist
9:41●●● 5G
Inspection reportLV electrical — commercial plant
Report 024

Inspection report

LV electrical — commercial plant
São Paulo, SP

24 Aug 2026
Norte Engenharia
Assigned · JS, MA, LF

Site conditions

Indoor 24 °C · plant in service

Crew

RoleQtyHours
Technician216 h
Helper18 h

Instruments

MI-27054 h
ET-40953 h
MTR-21002 h

Tests of the visit

Panel / circuit roundDone
Earth electrodeDone
Load board follow-upIn progress

Findings

Panel insulation >100 MΩ. Bus thermography with no critical hotspots (max 41.8 °C). Circuit current 18.4 A. Earth electrode 2.6 Ω. One watch item on a load board — schedule a follow-up.

Visit photos

Signatures

Eng. Lucas Ferreira — CREA 508789/SP
Supervisor João Alves
Inspection report
Team panel: activity and report editor

See it in practice

Start free and document your next electrical visit in one place.